Reset
Search recommendations
    headquarters
    Novatek

    The building of a multifunctional center, with class A offices, is 12-storey, with 3 underground floors to accommodate technical rooms and a parking lot. The underground floors are connected to the upper floors of the building by stairs and elevators, and also have a separate entrance and exit to the street in the form of an inclined ramp. The main entrance with a lobby and a recreation area is located on the ground floor. On the second floor, a restaurant (kitchen, storerooms, staff quarters) with a separate entrance and delivery of food, goods and waste disposal independent of the rest of the building will be envisaged. From the third to the 12th floor there are class “A” office premises, on the territory of which the headquarters of OJSC “Novatek” and a conference hall are located.



    The internal engineering systems of an office building are designed taking into account modern requirements for office centers of a similar level and include central air conditioning and supply and exhaust ventilation systems, a high-quality autonomous heating, ventilation and air conditioning system, a sprinkler fire extinguishing system and a fire smoke removal system, an access control system, round-the-clock security, as well as a video surveillance system.


    In 2012, the Novatek headquarters building was recognized as the best at the International Property Awards, receiving a 5-star status in the Best Office Architecture nomination.



    Figures and facts
    • Location Moscow
    • Area 17 596 m2
    • Built-up area 3700 m2
    • Number of storeys 12
    • Number of underground storeys 3
    • Architecture Speech
    • Investor Novatek
    Scope of work
    • Design stages Detail design
    • Design of internal engineering systems Heating, ventilation and air conditioning systems

      Water supply and sewerage systems

      Power supply systems

      Low-current system

      Automation and dispatching systems